Study on Reliability Analysis of Distributed Control System of Nuclear Power Plant

Article Preview

Abstract:

The reliability of the nuclear power plant DCS is analyzed using Markov process to establish a mathematical model. And the initial use of the model on the three indicators of reliability parameters of nuclear power plants is calculated. The results showed that the model is correct,reliable and error rate is 9×10-10.DCS applies to preliminary analysis of the reliability of nuclear power DCS. Nuclear power plant DCS reliability is high enough, the minimum time of continuous operation is up to 66667 h, compared to conventional control methods more safe and reliable.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 383-390)

Pages:

4281-4285

Citation:

Online since:

November 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jiao Yu-hong. DCS maintenance and reliability analysis [J]. Petroleum Engineering, 2004, 4: 82 ~ 83.

Google Scholar

[2] Qin Meng. analysis of DCS reliability [J]. Petroleum Engineering, 2008: 91 ~ 94.

Google Scholar

[3] Lijun Sun, Ding Weiling. Reliability Analysis of Distributed Control Systems [J]. Sinopec, 2008: 127 ~ 128.

Google Scholar

[4] Yuan Renguang. Distributed control system technology and examples [J]. Beijing Machinery Industry Press, 2003: 26 ~ 28.

Google Scholar

[5] He Yan, Li Yu. Reliability of distributed control systems [J]. Petroleum Engineering, 2007, (3): 39 ~ 42.

Google Scholar

[6] GB / T 14546 – 1993, Design criteria of nuclear power plant safety class power system [S].

Google Scholar

[7] Bai Huixian. Reliability analysis of DCS power supply system [J]. Automation Instrumentation, 2009, (3): 39 ~ 42 Fig. 1 State Transition Diagram of Availability Fig. 2 The State Transition Diagram of reliability.

Google Scholar