Research on the Whole Process Cost Control Methods of the Chemical Piping Engineering

Abstract:

Article Preview

Piping engineering, which involves a plenty of materials and has a large-scale construction work quantity, is an important part of chemical engineering, and how to make a good cost control of it is very important for the success of chemical project. Based on the Cybernetics and Systems science, this paper has established a whole process covered cost control model and proposed the control system for the piping engineering, and the related control strategies have been also proposed on this basis. Finally, combined with some cases, this paper analyzed the application of the whole process covered cost control methods in the chemical piping engineering.

Info:

Periodical:

Advanced Materials Research (Volumes 383-390)

Edited by:

Wu Fan

Pages:

4286-4293

DOI:

10.4028/www.scientific.net/AMR.383-390.4286

Citation:

X. J. Jin and C. X. Lin, "Research on the Whole Process Cost Control Methods of the Chemical Piping Engineering", Advanced Materials Research, Vols. 383-390, pp. 4286-4293, 2012

Online since:

November 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.