p.1928
p.1932
p.1936
p.1940
p.1944
p.1950
p.1959
p.1963
p.1969
Study on Simultaneous Nitrification and Denitrification with Biofilm for Chemical Wastewater
Abstract:
Aiming at the problem of lower removal efficiency of ammonia nitrogen in the activated sludge process for wastewater treatment plant of Jilin Chemical Company, a few tests were studied such as filler selection, biological hydrolysis-acidification process, nitrobacteria cultivation, activated sludge process and biofilm process, the feasibility of simultaneous nitrification and denitrification(SND) was developed with biofilm treatment for chemical poor-biological wastewater. The results showed that: SND occurred in the aerobic section, effluent total basicity (TB) in biofilm process was 2mmol / L or more, and was higher than activated sludge process, while the effluent TB in activated sludge process was about 0.1mmol / L,and nitrate produced by activated sludge process was 30mg/L higher than that of biofilm process. Nitrogen removal efficiency using SJ-1-type filler made in Jiangsu Suzhou Purification Group Co., Ltd was 15.01% more than that using combined filler.
Info:
Periodical:
Pages:
1944-1949
Citation:
Online since:
November 2011
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: