Nitrogen Control Technology for the Blowing Process of Combined Blowing Converter

Article Preview

Abstract:

At present, the nitrogen content in aimed molten steel is 18.32ppm on average in PISCO(Panzhihua Iron & Steel Co.), and there is big fluctuation for nitrogen content. To solve this problem, factors affected the nitrogen content while blowing is discussed, and a comprehensive nitrogen control technology is formed. Experimental results show that with this technology the nitrogen content in aimed molten steel can be controlled in 15ppm, with the average value is 12.53ppm. The average nitrogen content in aimed molten steel is reduced by 5.79ppm, and nitrogen content of aimed molten steel is well controlled.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

205-210

Citation:

Online since:

November 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] R. Tsujino. M. Kojima. Production Technology of High Purity Steel for High Class Line Pipes and Cold Sheets. Tetsu·to—Hagane,1990(76):1948—(1955)

DOI: 10.2355/tetsutohagane1955.76.11_1948

Google Scholar

[2] Huang Xi-hu. Metallurgy of iron and steelmaking. Beijing: Metallurgical Industry Press, 2006. 388.

Google Scholar

[3] Chen Jia-xiang. Metallurgy of iron and steelmaking (steelmaking part) [M]. Beijing: Metallurgical Industry Press, 1990. 91.

Google Scholar