Design of Reconstruction and Extension Projects of the Wastewater Plant of an Ordnance Repairing Factory

Article Preview

Abstract:

In order to improve the treatment capacity and effluent quality of the wastewater plant of an ordnance repairing factory in Guangzhou City, China. The wastewater treatment process was modified and the construction was extended. The factory mainly repairs military equipments in air force, discharges 1200 m3/d wastewater .The current operating conditions of original wastewater treatment equipments are unstable and the effluent quality is substandard, and that the capacity is inadequate.By upgrading the technology and tapping the potential of original process, enlarge the primary treatment capacity to 500 m3/d and build another treatment process with the treatment capacity of 700 m3/d.The total treatment capacity is adequate and effluent quality meet the demands of criteria A specified in DB44/26-2001 of Guangzhou.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

144-147

Citation:

Online since:

December 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Youzhi Wang: Water pollution control techniques (China Labor and Social Security Publishing House, China 2010).

Google Scholar

[2] Duwang Li, Jian Zhan, Xiaodong Huang and et al: Jiangxi Sci. Vol. 24(2006), p.47.

Google Scholar

[3] Rong Wang, Jun Zheng and Gang Zhang: Water & Waste Water Engineering. Vol. 32(2006), p.49.

Google Scholar