The Construction Technology of Large Amount Concreting to Pouring the Over-Length and Extra-Large Diameter Piles Foundation in Deep Water

Article Preview

Abstract:

This paper is to introduce the construction technology of Subaqueous Concreting of Lingjiang Large Bridge 43# pillar to pour the over-length and extra-large diameter piles foundation in deep water by the project case in order to summarize the construction experiences and technology.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 430-432)

Pages:

1805-1808

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Pengfeng Shi, Construction Technology of Extra-large Diameter Piles Foundation, Shanxi Architecture 2007(09).

Google Scholar

[2] Cheng hua, Gong Weiming Experimental Research on Post Grouting under Super-long and Large-diameter Bored Pile Tip Chinese Journal of Rock Mechanics and Engineering. 2010(29).

Google Scholar

[3] Chen Zhijian, Discussion on Post-grouting Mechanism at end of Super-long Large-Diameter Bored Piles. Journal of Hohai University (Natural Sciences), 2007(4).

Google Scholar

[4] Li Changyu Mechanism & Performance Test of Bored Pile with Post Grouting at Base. Quality of Civil Engineering and Construction, 2005(2).

Google Scholar