Research on Risk Assessment of Reservoir by AHP-Fuzzy Comprehensive Analysis Method

Article Preview

Abstract:

Because of the fuzziness and uncertainty of risk factors in the risk management, using fuzzy comprehensive evaluation model for research. The model not only identifies the main risk factors of the dam, spillway, and water facility, but also quantifies the influence weight by risk factors on dangerous reservoir. The affiliate degrees of risk factors on risk level can be get on the basis of membership function. So the final overall risk level of the dam, spillway, and water facility is able to compare. It will be set the priority to reinforcement measures for dangerous reservoir.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 430-432)

Pages:

1974-1978

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yu Jianxing, Project risk assessment and control(China Building Industry Press, Beijing 2009), pp.39-43, in Chinese.

Google Scholar

[2] Wang Qi. Practical Fuzzy(Science Press, Beijing1992), pp.194-201, in Chinese.

Google Scholar

[3] Li Lei, Wang Renzhong, etc, Dam risk assessment and risk management(China Water Power Press, Beijing 2006), pp.12-13, in Chinese.

Google Scholar

[4] Mao Ru tunnel risk assessment, Tunnel Construction Vol. 23 (2003), pp.1-3, in Chinese.

Google Scholar

[5] Chen Liwen. the project investment risk analysis theory and methods(Mechanical Industry Press, Beijing 2004), pp.130-134, in Chinese.

Google Scholar