p.1182
p.1186
p.1190
p.1194
p.1199
p.1203
p.1207
p.1213
p.1217
Stability Analysis during Concrete Pumping for a CFST Arch Bridge Rib
Abstract:
Abstract. This paper lists the problems during the stability analysis of long span CFST arch bridge and the corresponding modeling method. Based on the construction control of an orthotropic long span CFST arch bridge, a FEM model had been established to analysis the stability of its rib during the concrete pumping. The conclusion shows significant importance to the bridge’s construction process.
Info:
Periodical:
Pages:
1199-1202
Citation:
Online since:
January 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: