Stress Monitoring on Cantilever Construction Stage of the Main Bridge of South-to-North Water Transfers Canal

Article Preview

Abstract:

This paper presents the importance of stress monitoring in cantilever construction stage of concrete continuous bridge. The stress analysis model based on the actual bridge is established by the beam elements. The measuring measurement scheme and influencing factors of stress monitoring are introduced. The measured results matched the calculated results very well, which meet the needs of construction safety.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

1213-1216

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Junlan Xu,Large-span Bridge Construction Control,Beijing People's Communications Press ,Be- jing ,2000.In Chinese.

Google Scholar

[2] Changsong Chen :China Road.Vol.17 (2004), p.29. In Chinese.

Google Scholar

[3] Y uchuan Bai,Control Technique for Construction of Long-span Prestressed Concrete Bridge and the Prearranged Height of Girders Calculation,Fuzhou University Press,China,2007.In Chinese.

Google Scholar