Numerical Simulation of Pumping Well-Underground Concrete Wall-Recharging Well in Dewatering of Deep Foundation Pit

Article Preview

Abstract:

With the foundation pit of south air shaft nearby Qiantang River, Subway No.1, Hangzhou, Zhejiang province as an example, the interaction between pumping wells and underground concrete wall, together with the soft curtain formed by recharging wells are simulated with numerical method. The results indicate that the proper position of filter tube of pumping well to underground concrete wall can reduce the drawdown outside pit, and the drawdown outside pit can be reduced by recharging curtain.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

1764-1768

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] WANG Cuiying; WANG Jiayang.Research on Effect of Filter Tube Stop Water Heavy Curtain to Surrounding Ground Settlement. Journal of Wuhan University of Technology(2006),28(6): 69-72

Google Scholar

[2] YUJianlin; GONG Xiaonan.Study on the Design and the Application of the Groundwater Recharge System in Excavation. Journal of Building Structures(2001), 22(5):70-74

Google Scholar

[3] ZhengYoucai.Application of Recharging Technique in Dewatering of Foundation Pit.Site Investigation Science and Technology(2007),(3):37-39

Google Scholar

[4] HEYawei;YINXiaotao.Study on dewatering and recharging of deep foundation pit by numerical test. Sichuan Building Science (2008),34(5):108-112

Google Scholar