New Construction Method of Marine Cofferdam on the Soft Ground in Tideland

Article Preview

Abstract:

The marine cofferdams of the littoral new town in Lianyungang were constructed with geotextile bags filled with solidified soil and the soft ground under the cofferdams was treated by under water vacuum preloading method. The dimension of the cofferdams was reduced while the foundation kept stable. And the cofferdams were configurated with the geotextile bags filled with solidified soil, the silt clay was utilized adequately, the sand stone resource was saved and protected, the obvious effect was achieved. This method can be promoted in construction of marine cofferdams.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

1785-1790

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Qingli Tian, Baohua Li, Yehao Zhu. China Harbour Engineering, 2002(8): 50-53. In Chinese.

Google Scholar

[2] Aimin Liu. Port & Waterway Engineering, 2007(2): 24-27. In Chinese.

Google Scholar

[3] Hongwei Liu. 2006,16(B07): 45-49. In Chinese.

Google Scholar

[4] Zhiliang Dong. Chinese Journal of Rock Mechanics and Engineering, 2006(z2): 3490-3494. In Chinese.

Google Scholar