The Application for Reinforced Concrete Piles of Chamber on Soft Foundation Treatment

Article Preview

Abstract:

This paper explains foundation treatment technique of a sluice in Eastern Liaoning province. Because the chamber is situated at the entrance of the Yellow Sea, under the influence of tides, seawater flow backward yearly. Thus the construction project is an extreme significance to national economy and people's living and environmental protection. Due to its special geographical position bordering the estuary, the foundation soil is complex; silt clay distributes widely, silt clay and fine sand layers staggered. Additionally, seismic intensity is eight degrees, so that it is of no engineering geological significance and is not used directly as a stratum. Therefore, for the soil of the chamber, method of reinforced concrete casting pile for reinforcement is used to meet the different requirements of various working conditions.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

1884-1887

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Junya Liu: GUANGDONG SCIENCE & TECHNOLOGY, Vol.20, No.10 (2011), pp.95-96, in Chinese.

Google Scholar

[2] Yunli Yao, Xiaomin Jiang: YANGIZE RIVER, Vol.38, No.5 (2007), pp.72-74, in Chinese.

Google Scholar

[3] Shiming He, Cheng Jia, Jinxia Cheng, Xinfeng Huang, Pingwen Chai, Haining Wang: EXPLORATION ENGINEERING (ROCK & SOIL DRILLING AND TUNNELING), Vol.34, No.zl(2007),pp.187-190, in Chinese.

Google Scholar

[4] Liangjin Lin: Information on http://d.g.wanfangdata.com.cn/Thesis_Y1520641.aspx,30-52, in Chinese.

Google Scholar