Simulating and Testing Study on Construction Temporal-Spatial Effect of Six Lanes Multi-Arch Tunnel

Article Preview

Abstract:

Abstract: Owing to several construction procedures of bidirectional 6 lane multi-arch tunnel, with the characteristics of large dig span and flat cross section, the wall rock and support structure of which will be repeatedly disturbed by multiple excavations, so their mechanical and deformational features are remarkably complicated. Combined with the design and construction practice of Sha Tangkeng bidirectional 6 lane multi-arch tunnel of Guang-He highway, taking the V grade surrounding rock for case, with the help of 3-dimension finite element numerical simulation method and 3-dimension physical similar model test, the paper studied the entire dynamic construction process of bidirectional 6 lane multi-arch tunnel, analyzed the chang characteristics of displacement and stress of wall rock and stress of supporting structure, and revealed the time-space effect laws of construction of bidirectional 6 lane multi-arch tunnel.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

2149-2155

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] N.Zhuang, K.Z Zhu, J.W Li. Research on partial pressure joint arch tunnel s dynamic simulation and optimum analysis of construction process. Rock and Soil Mechanics, 2010, (04): 2875- 2880(in Chinese)

Google Scholar

[2] J H HWANG, M KIKUMOTO, K KISHIDA. Dynamic stability of multi-arch culvert tunnel using 3-D FEM. Tunnelling and Underground Space Technology, 2006, 21: 384-389.

DOI: 10.1016/j.tust.2005.12.195

Google Scholar

[3] G GALLI, A GRIMALDI, A LEONARDI. Three-dimensional modeling of tunnel excavation and lining. Computers and Geotechnics, 2004, 31(3): 171-183.

DOI: 10.1016/j.compgeo.2004.02.003

Google Scholar

[4] T UNL, H GERCEK. Effect of Poisson's Ratio on the Normalized Radial Displacements Occurring around the Face of a Circular Tunnel. Tunnelling and Underground Space Technology, 2003, 18: 547-553.

DOI: 10.1016/s0886-7798(03)00086-5

Google Scholar

[5] C.S WU, J.X LI, X CHEN, et al. Blasting in Twin Tunnels with Small Spacing and it Vibration Control. Tunnelling and Underground Space Technology, 2004, 19: 518-523(in Chinese).

DOI: 10.1016/j.tust.2004.02.112

Google Scholar

[6] W.Q Ding, X.X Wang, Z.G Li, et al. Optimal analysis of construction schemes for shallow large span Longshan twin tunnel. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(22): 4042-4047(in Chinese).

Google Scholar

[7] KATUSHI MIURA, HIROSHI YAGI, Hiromichi Shiroma. Study on design and construction method for the New Tomei-Meishin expressway tunnels. Tunnelling and Underground Space Technology, 2003, 18: 271-281.

DOI: 10.1016/s0886-7798(03)00036-1

Google Scholar

[8] T. Xu. Application of similarity method [M]. Beijing: China Machine Press, 1995(in Chinese)

Google Scholar