p.251
p.260
p.264
p.269
p.274
p.278
p.283
p.288
p.293
Construction Monitoring Techniques for JU-MA River NO.3 Bridge
Abstract:
Construction monitoring is a system, especially for long-span pre-stressed concrete continuous rigid frame bridge. Based on the construction control of the right bridge Ju-ma River NO.3 Bridge, this paper has made comprehensive conclusion and detailed discussion in the aspects of construction control method, the basic process of construction control, and bridge construction control survey methods. The findings described herein will provide considerable reference for the construction control of other similar long-span bridges.
Info:
Periodical:
Pages:
274-277
Citation:
Online since:
January 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: