Analysis of Mechanical Behavior of Subway Tunnel Constructed by Cover and Cut Reverse Method

Article Preview

Abstract:

In the paper, not only the internal force and displacement of structure during subway tunnel construction with cover and cut reverse method, but also the displacement field and stress field of surrounding rock are analysed. From the numerical calculation it is shown that the bending moment of diaphragm wall is affected seriously by the distribution and value of the stiffness of horizontal support; the excavation phase of the soil of the second floor underground is the key phase of the construction process because the internal force of structure has large increase; the value of surface settlement, horizontal displacement of diaphragm wall, differential settlement between middle pillar and diaphragm walls all meet the requirements, so the construction is safe and the surrounding buildings are affected slightly.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

3623-3627

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] The Ministry of Construction of the People's Republic of China. Code for design of metro (GB 50157—2003). Beijing:China Planning Press,2003(In Chinese).

Google Scholar

[2] Li Wei: The Example Analysis of ANSYS in Tunnel and Underground Engineering. Beijing: China Water Power Press,2007(In Chinese).

Google Scholar

[3] Zhong Shan-tong: United Theory for Steel Tube-confined Concrete—Research and Application. Beijing: Tsinghua University Press,2006(In Chinese).

Google Scholar

[4] Jiang Chen-guang: Theories and Practice of Pit Engineering. Beijing: Chemical Industry Press, 2009(In Chinese).

Google Scholar