Forecast on Payback Period of Restaurant Projects Investment by Computer Simulation

Article Preview

Abstract:

Investment projects of the civil engineering have many characteristics,such as large scale of construction,tremendous investment cost,long payback period of investment, and bad risk. For investors, the investment payback period of construction projects is an important index that evaluate and measure economic effect of project investment. The investment capital can be recovered in the operation of actual projects by the influence of random factors, it is difficult that the investment payback period of construction projects is calculated generally using analytic method. Combined with restaurant project in this paper, set up the mathematical model of the payback period of investment, find out random factors that influence its cash flow of restaurant project, to research and measure the data of random factors on existing similar projects, to determine the probability distribution of random parameters,and Statistical data processing, make use of the computer simulation, set up the simulation model of the payback period of investment, to forecast the static and dynamic payback period of construction projects,provided decision-making with scientific base and meaningful reference.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

3782-3786

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xing Hao Xie, Computer simulation for system of construction engineering[M]. Beijing: Science Press,(2001),p,1-50..(in Chinese).

Google Scholar

[2] XiuQin Shi, ChuangYi Zhang. Simulati0n model for payoff period of construction project[J]. Engineering Construction,6(2008), p,14-17. (in Chinese).

Google Scholar

[3] Xing Gao, DianGuang Zhang, Jie Yuan,etc.The Energy Consumption Analvsis of Hotel F&B Service Process in China[J]. Building Science, Vol.23 (2007), p,40-44.(in Chinese).

Google Scholar

[4] Jin J Y, Quantitative analysis of investment recovery period on real estate project[J]. PriceTheory & Practice,8(2009), p,39-40. (in Chinese)

Google Scholar

[5] RJ. Wales, S.M. AbouRizk, An integrated simulation model for construction[J]. Simulation Practice and Theory 3 (1996), p,401-420.

DOI: 10.1016/0928-4869(95)00018-6

Google Scholar

[6] Yu-Ting Lai, Wei-Chih Wang, Han-Hsiang Wang. AHP- and simulation-based budget determination procedure for public building construction projects[J]. Original Research Article Automation in Construction,Vol.17 (2008), p,623-632.

DOI: 10.1016/j.autcon.2007.10.007

Google Scholar

[7] GuoWen Liu, The significance of information system Construction in restaurant business[J]. Cooking Knowleage, 5 (2005), p,26.(in Chinese).

Google Scholar

[8] Liu L M, Bhattacharyya S, Sclove S L, etc. Data mining On time series, an illustration using fast-food restaurant franchise data[J]. Computational Statistics & Data Analysis, Vol.37 (200l), p,455-476.

DOI: 10.1016/s0167-9473(01)00014-7

Google Scholar

[9] Fan P Y, Theory and application of randomized procedure[M]. Beijing: Tsinghua University Press, 2005. (in Chinese).

Google Scholar