Research on Inventory Sharing Policy in Assembly System with Random Demand Time

Article Preview

Abstract:

This paper investigates the inventory sharing policy in an assembly system with random demand time. A Stackelberg game has been built in a similar supply chain setting: manufacturer first decide the length of time period that for supplier taking charge of the inventory, and then followed by supplier chooses a best deliver time to manufacture. The research not only finds out the optimal decisions for both parties but also provide a relatively simple mechanism to achieve the supply chain coordination. The result shows that comparing to the traditional VMI policy, inventory sharing policy is always a better choice no matter for the supply chain or the manufacturer.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 452-453)

Pages:

833-837

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] S. Qetinkaya, Lee, C.Y., , Stock replenishment and shipment scheduling for vendor-manage inventory systems. Management science, Vol. 46(2000), pp.217-232.

DOI: 10.1287/mnsc.46.2.217.11923

Google Scholar

[2] S.M. Disney, D.R. Towill, The effect of vendor managed inventory (VMI) dynamics on the Bullwhip Effect in supply chains. Int. J. Production Economics, Vol. 85(2003), pp.199-215.

DOI: 10.1016/s0925-5273(03)00110-5

Google Scholar

[3] C. Lee, W. Chu, Who should control inventory in a supply chain? European Journal of Operational Research, Vol. 164(2005), pp.158-172.

DOI: 10.1016/j.ejor.2003.11.009

Google Scholar

[4] X. Dong, K. Xu, A supply chain model of vendor managed inventory, Transportation Research Part E, Vol. 38(2002), pp.75-95.

DOI: 10.1016/s1366-5545(01)00014-x

Google Scholar

[5] A.V. Iyer, M.E. Bergen, Quick response in manufacturer-retailer channels. Management Science , Vol. 43 (1997) , pp.559-570.

DOI: 10.1287/mnsc.43.4.559

Google Scholar

[6] J.R. Grout, D.P. Christy, A model of incentive contracts for just-in-time delivery. European Journal of Operational Research , Vol. 96(1996), pp.139-147.

DOI: 10.1016/s0377-2217(96)00030-6

Google Scholar

[7] A.L. Guirida, R. Nagi, Cost characterizations of supply chain delivery performance, Int. J. Production Economics, Vol. 102(2006), pp.22-36.

DOI: 10.1016/j.ijpe.2005.01.015

Google Scholar

[8] J.R. Grout, Inuencing a Supplier Using Delivery Windows: Its Effect on the Variance of Flow Time and On-Time Delivery, Decision Science, Vol. 29(1998), pp.747-764.

DOI: 10.1111/j.1540-5915.1998.tb01362.x

Google Scholar