Study on the Structure and Factors of TOT Applied in Water Conservancy and Hydropower Project

Article Preview

Abstract:

TOT project financing structure includes Renshi structure Wushi structure and Lishi structure [1]. Based on the qualitative analysis separately of the three structures, the article built the factor analysis framework for the three structures by the method of fuzzy entropy. The article will lay the foundation for further research on integration of the three structures.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 468-471)

Pages:

1564-1569

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Songjiang Wang: Operation of Public Infrastructure TOT Project Management [M] Beijing: Science Press, 2011(in Chinese)

Google Scholar

[2] Li Li: Science and Technology Management Research, 2008(6), 485-487 (in Chinese)

Google Scholar

[3] Shouqing Wang, Yongjian Ke: Project Finance of Franchise(BOT, PFI and PPP)[M]. Beijing: Tsinghua University Press, 2008 (in Chinese)

Google Scholar

[4] Songjiang Wang, Xiaofang Wang, Wanchun Duan: TOT Project Management [M] Kunming: Yunnan Science & Technology Press, 2005 (in Chinese)

Google Scholar

[5] Li Ma, Songjiang, Debaohan, Productivity Research, 2010(6):116-139 (in Chinese)

Google Scholar