Integration of Simulation Modeling and Comparison of Scheduling Methods to Minimize the Makespan in a Printing Industry

Article Preview

Abstract:

This paper considers the problem of scheduling production activities in a real-life printing industry. The problem is modeled as a two-stage flexible flow shop problem with minimization of the makespan and the number of tardy jobs as the objective. Discrete event simulation has been performed using Extend simulation software to depict the real time model of the print industry. The setup time, processing time and completion time of the prioritized customers were obtained and validated with the real time industry inputs. After validation, the output of simulation data has been used to perform preliminary scheduling experiments. This paper deals with the comparison of three scheduling algorithms such as earliest completion time first (ECT), Earliest start time first (EST) and PCmax algorithm for the calculation of maximum occupancy time of various printing jobs. The results obtained using PC max shows the reduced make span of the printing jobs compared to other two algorithms with approximately 12% improvement in minimizing the makespan. Hence the P||Cmax scheduling method can be implemented in the industry to minimize the maximum occupancy time of a particular printing machine. This motivates the actual implementation of the proposed ILP (PCmax scheduling) procedure for the printing industry.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 488-489)

Pages:

1119-1124

Citation:

Online since:

March 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Allaoui H. and A. Artiba (2006) Scheduling two-stage hybrid flow shop with availability constraints. Computer & Operation Research 33, 1399-1419.

DOI: 10.1016/j.cor.2004.09.034

Google Scholar

[2] Azizoglu M., E. Cakmak, and S. Kondakci (2001) A flexible flowshop problem with total flow time minimization. European Journal of Operational Research, 132, 528-538.

DOI: 10.1016/s0377-2217(00)00142-9

Google Scholar

[3] Botta-Genoulaz V. (2000) Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. International Journal of Production Economics, 64, 101-111.

DOI: 10.1016/s0925-5273(99)00048-1

Google Scholar

[4] Haouari, M. and R. M'Hallah (1997). Heuristic algorithms for the two-stage hybrid flowshop problem. Operations Research Letters 21, 43-53.

DOI: 10.1016/s0167-6377(97)00004-7

Google Scholar

[5] Jin, Z., Z. Yang and T. Ito (2006). Meta heuristic algorithms for the multistage hybrid flowshop scheduling problem. International Journal of Production Economics, 100, 322-334.

DOI: 10.1016/j.ijpe.2004.12.025

Google Scholar

[6] Naderi, B. & Ruiz, R. (2010). The distributed permutation flowshop scheduling problem, Computers & Operations Research, 37, 754 – 768.

DOI: 10.1016/j.cor.2009.06.019

Google Scholar

[7] Portmann M.C., A. Vignier, D. Dardilhac and D. Dezalay (1998) Branch and bound crossed with GA to solve hybrid flowshops. European Journal of Operational Research, 107, 389-400.

DOI: 10.1016/s0377-2217(97)00333-0

Google Scholar

[8] Soewandi, H. and S.E. Elmaghraby (2001). Sequencing three-stage flexible flowshops with identical machines to minimize makespan. IIE Transactions 33, 985-993.

DOI: 10.1080/07408170108936889

Google Scholar

[9] Vallada, E. & Ruiz, R. (2009). Cooperative meta heuristics for the permutation flowshop scheduling problem, European Journal of Operational Research, 193, 365-376.

DOI: 10.1016/j.ejor.2007.11.049

Google Scholar

[10] Parneet Kaur, Dheerendra Singh, Gurvinder Singh, Navneet Singh, analysis, comparison and performance evaluation of BNP scheduling algorithms in parallel processing, International Journal of Information Technology and Knowledge Management, Volume 4, No. 1, pp.279-284, (2011).

Google Scholar

[11] "Fast Scheduling and Partitioning Algorithm in the Multiprocessor System with Redundant Communication Resources, 2008 available from: www. springerlink. com/content/0np00wu1r0c7te8m/fulltext. pdf.

Google Scholar