Lead Price Forecasting Based on ARIMA Model

Article Preview

Abstract:

The time series ARIMA (3,1,4) model was established, which is taken into use of price forecasting. Then the forecasted price was applied to mining technical and economic index optimization study. Lead prices could be reliably predicted by time series ARIMA model, which had a high accuracy and the percentage of prediction error was 2.97% on average. It can solve the problems of the price data lag in the study of mine economic index optimization very well.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 488-489)

Pages:

1582-1586

Citation:

Online since:

March 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] YI Dan-lu: Data Analysis and Eviews Applications, Beijing: China Statistics Press, pp.106-132.

Google Scholar

[2] WU Huai-yu: Analysis and Synthesis of Time Series, Wuhan University Press (2004), pp.37-42.

Google Scholar

[3] XUE Dong-mei: Application of the ARIMA Model in Time Series Analysis, Journal of Jilin Institute of Chemical Technology (2010), pp.80-83.

Google Scholar

[4] ZHANG DA-WEI, LIU Bo, LIU Qi: Data Statistics and Analysis of Eviews Tutorials, Tsinghua University Press (2010), pp.124-126.

Google Scholar