p.1603
p.1609
p.1614
p.1619
p.1624
p.1631
p.1636
p.1641
p.1646
Inspection Manpower Planning for X & S Control Charts
Abstract:
A method of determining the optimal number of inspectors and/or working time required on a specific SPC activity is presented in the study. The issue of inspection manpower planning is handled as a constrained optimization problem. The optimization strategy is not only to minimize the avoidable surplus quality loss due to failure of detecting the out-of-control states but to determine the cost of inspection manpower from the perspective of deploying an appropriate amount of inspection manpower in a cost-effective manner, and meanwhile the values of sample size, sampling interval and control limits of control charts are also determined. The result obtained indicates that the total cost (or loss) can be substantially reduced if implementing control charts was equipped with adequate inspection manpower.
Info:
Periodical:
Pages:
1624-1630
Citation:
Online since:
March 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: