Inspection Manpower Planning for X & S Control Charts

Article Preview

Abstract:

A method of determining the optimal number of inspectors and/or working time required on a specific SPC activity is presented in the study. The issue of inspection manpower planning is handled as a constrained optimization problem. The optimization strategy is not only to minimize the avoidable surplus quality loss due to failure of detecting the out-of-control states but to determine the cost of inspection manpower from the perspective of deploying an appropriate amount of inspection manpower in a cost-effective manner, and meanwhile the values of sample size, sampling interval and control limits of control charts are also determined. The result obtained indicates that the total cost (or loss) can be substantially reduced if implementing control charts was equipped with adequate inspection manpower.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 488-489)

Pages:

1624-1630

Citation:

Online since:

March 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] D.C. Montgomery: Introduction to Statistical Quality Control (John Wiley and Sons, U.S.A. 2001).

Google Scholar

[2] W. Zhang, M. Shamsuzzaman and E.S. Pan: Optimization Design of Control Charts Based on Taguchi's Loss Function and Random Process Shifts, Int J Prod Res, Vol. 42 (2004) No. 2, p.379.

DOI: 10.1081/00207540310001614169

Google Scholar

[3] W. Zhang, M. Shamsuzzaman, and Q. Wang: Designs of Control Charts with Optimal Manpower Deployment, Int J Prod Res, Vol. 44 (2006) No. 11, p.2119.

DOI: 10.1080/00207540500478413

Google Scholar

[4] W.A. Yang, Y. Guo and W.H. Liao: Economic and Statistical Design of and S Control Charts using an Improved Multi-objective Particle Swarm Optimisation Algorithm, Int J Prod Res, Vol. 0 (2011a) No. 0, p.1.

DOI: 10.1080/00207543.2011.571448

Google Scholar

[5] Y.C. Lam, M. Shamsuzzaman, S. Zhang and W. Zhang: Integrated Control Chart System-Optimization of Sample Sizes, Sampling Intervals and Control Limits, Int J Prod Res, Vol. 43 (2005) No. 3, p.563.

DOI: 10.1080/00207540512331311840

Google Scholar

[6] G. Taguchi, E.A. Elsayed, T. Hsiang: Quality Engineering in Production Systems (McGraw-Hill Book Company, U.S.A. 1989).

Google Scholar

[7] W.A. Yang, Y. Guo and W.H. Liao: Optimization of Multi-pass Face Milling using a Fuzzy Particle Swarm Optimization Algorithm, Int J Mach Tools Manuf, Vol. 54 (2011b) No. 1-4, p.45.

DOI: 10.1007/s00170-010-2927-5

Google Scholar