A Model for IT/IS Project Portfolio Selection in the Presence of Uncertainty: Combination of Fuzzy Multi-Criteria Decision Making and Fuzzy Mathematical Programming

Article Preview

Abstract:

IT/IS represents a substantial financial investment for many organizations. Making IT project portfolio decision is difficult, because long lead times of IT project and market and technology dynamics lead to unavailable and unreliable collected data for portfolio management. This uncertainty has been modeled using fuzzy concepts. We need a collective model that will help decision-makers evaluate potential new investment projects in an easy, cost-effective, and collective manner. Hence, we propose a new approach based on the fuzzy multi-criteria decision model (FMCDM) and a fuzzy binary multi-objective linear programming model, featuring a 2-stage evaluation and selection process with 19 criteria for IT/IS investment. At the first stage, evaluation, all stakeholders in a corporation can decide the relative weights they give to the criteria when they evaluate a new IT/IS project by using linguistic values. Experts can also use linguistic values to evaluate all candidates easily. Only an Excel worksheet is needed to obtain an evaluation result. The results of FMCDM of the aforementioned are treated as input of a fuzzy binary mathematical programming model as coefficients of objective functions, which is the second stage of the proposed model. In the second stage, selection, we have developed a fuzzy binary mathematical programming model in order to find an optimum combination of investment portfolio considering a multi-objective measurement function in three ways: to maximize the benefit, to maximize the confidence level and to minimize the cost of projects in a complete ambiguous condition, when their initial investment costs, profits, confidence levels, resource requirements and total available budgets are assumed to be uncertain. We solve it in Lingo 10.0 through a Branch and Bound algorithm. In this paper, for the first time we have developed a model for IT/IS project portfolio selection in presence of uncertainty that is combination of fuzzy multi-criteria decision making and fuzzy mathematical programming with 19 criteria that is compatible with the nature of IT projects. We conduct a case study to show how this model can be used and discuss the results.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 488-489)

Pages:

411-416

Citation:

Online since:

March 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] K.KhaliliDamghani, S.Sadi-Nezhad. A modular Decision Support System for optimum investment selection in presence of uncertainty: Combination of fuzzy mathematical programming and fuzzy rule based system. Expert Systems with Applications. 2011. 150(3), 496–515.

DOI: 10.1016/j.eswa.2010.07.040

Google Scholar

[2] Y.Chan, J. P. DiSalvo, M.Garrambone. A goal-seeking approach to capital budgeting. Socio-Economic Planning Sciences. 2005.39 (2), 165–182.

DOI: 10.1016/j.seps.2004.04.002

Google Scholar

[3] S.Coldrick, P.Longhurst, P.Ivey & J.Hannis. An R&D options selection model for investment decisions. Technovation. 2005.25(3), 185–193.

DOI: 10.1016/s0166-4972(03)00099-3

Google Scholar

[4] R. E.Steuer & P.Na. Multiple criteria decision making combined with finance: A categorized bibliographic study. European Journal of Operational Research. 2003.150 (3), 496–515.

DOI: 10.1016/s0377-2217(02)00774-9

Google Scholar

[5] A. Badri.Masood, D. Davis. A comprehensive0–1 goal programming model for project selection. International Journal of Project Management. 2001. 19(4), 243–252.

DOI: 10.1016/s0263-7863(99)00078-2

Google Scholar

[6] T.Sueyoshi, J.Shang & C.Wen-Chyuan. A decision support framework for internal audit prioritization in a rental car company: A combined use between DEA and AHP. European Journal of Operational Research. 2009. 199, 219–231.

DOI: 10.1016/j.ejor.2008.11.010

Google Scholar

[7] R.Mirani, A.L. Lederer. An instrument for assessing the organizational benefits of IS projects. Journal of Decision Sciences.1998. 29 (4), 803–838.

DOI: 10.1111/j.1540-5915.1998.tb00878.x

Google Scholar

[8] Tzy-Yuan Chou, T.Seng-cho Chou, Gwo-Hshiung Tzeng, Chou et al. Evaluating IT/IS investments: A fuzzy multi-criteria decision model approach. European Journal of Operational Research. 2006.173, 1026–1046.

DOI: 10.1016/j.ejor.2005.07.003

Google Scholar

[9] J.Wang, W.L. Wang and Hwang. A fuzzy set approach for R&D portfolio selection using a real options valuation model. International journal of Management sciences. 2007. 29 (4), 803–838.

DOI: 10.1016/j.omega.2005.06.002

Google Scholar

[10] R.Mirani, A.L. Lederer. An instrument for assessing the organizational benefits of IS projects. Journal of Decision Sciences. 1998. 29 (4), 803–838.

DOI: 10.1111/j.1540-5915.1998.tb00878.x

Google Scholar

[11] Z.Irani, P.E.D. Love. Developing a frame of reference for ex-ante IT/IS investment evaluation. European Journal of Information Systems. 2002. 11 (l), 74–82.

DOI: 10.1057/palgrave.ejis.3000411

Google Scholar