Comparison and Selection of the Natural Gas Pipeline Crossing Yangtze River Schemes in Jangling

Article Preview

Abstract:

In the light of the characteristics of the project across the Yangtze River from Jangling through large distance and the crossing section’s less construction experience, a detailed survey had beencarried out ,by comparison of survey data analysis , this paper forecasts the program may emerge some specific engineering geological problems and finally gives the appropriate construction program.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 524-527)

Pages:

1363-1367

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhenhan Cheng, Shuguo Sun, Xiangwei Fang,etal.Recent advances of the measuring technology for unsaturated soils and special soils [J].Chinese Journal of Geotechnical Engineering, 2006, 28(2):147-169.

Google Scholar

[2] Huaqi Song. Crossing Technique of Xiangfan Branch of Zhong-Wu Pipeline through Hanjiang River by Large Excavation. Petroleum Engineering Construction 04(2005)

Google Scholar

[3] Yangkyun Kim. Effect of rock mass quality on construction time in a road tunnel. Tunnelling and Underground Space Technology24(2009)

DOI: 10.1016/j.tust.2009.02.004

Google Scholar

[4] Peterson, CR, Rapidex Inc. Boxford, Mass .Study of a continuous drill and blast tunneling concept. International Journal of Rock Mechanics and Mining Sciences 11(1974)

Google Scholar

[5] Zhaomiao Liu, Xin Liu, Guobin Wang .Analysis on Vortex in Drag Creeping Laminar-flow of Coating Fluids Between Plates Journal of Beijing University of Technology08(2011)

Google Scholar

[6] Weitao Chen, Mingnian Wang .Analysis of causes and disposals for water gushing of land regions Xiamen of submarine tunnel [M. Chinese Journal of Geotechnical Engineering(2008)

Google Scholar

[7] Tingwu Lei, M.A. Nearing .Laboratory Experiments of Rill Initiation and Critical Shear Stress in Loose Soil Material. Transactions of the Chinese Society of Agricultural Engineering 16(2000)

Google Scholar

[8] X. Wang, R.L. Sterling. Stability analysis of a borehole wall during horizontal directional drilling. Tunneling and Underground Space Technology 22 (2007)

DOI: 10.1016/j.tust.2007.01.002

Google Scholar

[9] Jianghua He, Jihai Ran, Baoyan Sang, Tailin Chen .Commom Problems in Sunk Well Construction and Solution to These Problems. Construction Technology s1 (2005)

Google Scholar

[10] Jiangang Zhang, Chuan He, Zheng Yang. Study on Reinforcement of Segment Lining Structure for Large-scale Underwater Shield Tunnel. Journal of the China Railway Society05(2009)

Google Scholar