Study on Pumping Perforation Technique for Horizontal Wells

Article Preview

Abstract:

Aiming at the deficiencies of tubing-conveyed oriented perforating technology for horizontal well, a pumping perforation technology in horizontal well has been developed. Pumping perforation technology process is a perforation process transferring the perforating gun string into perforation section of the horizontal well with pumping fluid, and then completing the perforation while perforating bullets exploding after powering on, and finally towing back the perforating gun to the ground with cable. It is of the advantages such as simple perforation column, simple and convenient process and the shorter operating time. Perforating gun string is acted on by the impact, gravity and buoyancy of pumping liquid during moving in the horizontal section. Based on the theory of metal friction and the hydraulics principles, the calculation model of the critical injection rate (namely pumping displacement ) in the horizontal section is established by considering the effect of the composition of the gun string, buoyancy, friction coefficient, heavy guns, gun ramps, pumping fluid density, and calculated the impact of impact, effects of assembly components of gun string, pumping-fluid buoyancy, frictional coefficient, weight of gun, angle of gun-string, pumping-fluid density and computing method of impacting force. Field applications show that the calculation model established can meet the construction needs.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 524-527)

Pages:

1598-1601

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Tang Haijun, Xu Guichun, Duan Zhigang,etc. :Study on Productivity Prediction of Horizontal wells with perforation completion and its application. Oil Drilling & Production Technology. ,Vol. 32(3)(2010),p.27~32.

Google Scholar

[2] Lv Bingchuan, Yv donghe, Zhao Jinzhou, etc.: Productivity prediction model study for horizontal wells and extended reach wells after fracturing. Oil and gas well testing. Vol.15(2)(2006) , p.12~13.

Google Scholar

[3] Peach S.C., Jensen R E and Robertshaw S. C. :Completion and evaluation of cased horizontal wells. JCPT, Vol.30(5)(1991), p.26~32.

DOI: 10.2118/91-05-01

Google Scholar

[4] McSpadden A, Brown P .and Davis T.: Field Validation of 3-Dimensional Drag Model for Tractor and Cable-Conveyed Well Intervention. SPE 71560(2001).

DOI: 10.2118/71560-ms

Google Scholar