p.306
p.310
p.317
p.321
p.325
p.330
p.337
p.341
p.351
Research on Rapid Excavation Technology of Roadway in Coal Seam with the Risk of Coal and Gas Outburst
Abstract:
According to the questions of long eliminating coal and gas outburst period, large projects and slow driving came from the regional measurement of drilling hole ,the paper select 2371 (1) rail transport roadway as experiment for using along seam long drilling as a regional measurement to eliminate coal and gas outburst. Since the regional measurement of along seam long drilling had been carried out, the remaining gas content decreased more than 60%, max Smax was 5.4kg/m, max qmax was 2.01/min.Both Smax and qmax were not beyond the standard. Gas concentrations were not overrun. Gas emission decreased in the roadway afterward. The regional measurement eliminated the risk of coal and gas outburst in effect. Heading face promoted 423m forward safely. The max January footage could reach 120m.Achieve driving of heading face safely and fast.
Info:
Periodical:
Pages:
325-329
Citation:
Online since:
May 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: