[1]
S. K. Goyal, An integrated inventory model for a single supplier-single customer problem, International Journal of Production Research, vol. 15, pp.107-111, (1977).
DOI: 10.1080/00207547708943107
Google Scholar
[2]
A. Banerjee, A joint economic-lot-size model for purchaser and vendor, Decision Sciences, vol. 17, pp.292-311, (1986).
DOI: 10.1111/j.1540-5915.1986.tb00228.x
Google Scholar
[3]
S. K. Goyal, A joint economic-lot-size model for purchaser and vendor: A comment, Decision Sciences, vol. 19, pp.236-241, (1988).
DOI: 10.1111/j.1540-5915.1988.tb00264.x
Google Scholar
[4]
R. M. Hill, The single-vendor single-buyer integrated production–inventory model with a generalized policy, European Journal of Operational Research, vol. 97, pp.493-499, (1997).
DOI: 10.1016/s0377-2217(96)00267-6
Google Scholar
[5]
S.L. Kim and D. Ha, A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage, Int. J. Production Economics, vol. 86, pp.1-10, (2003).
DOI: 10.1016/s0925-5273(03)00006-9
Google Scholar
[6]
M. Ben-Daya, M. Darwis, and K. Ertogral, The joint economic lot sizing problem: Review and extensions, European Journal of Operational Research, vol. 185, pp.726-742, (2008).
DOI: 10.1016/j.ejor.2006.12.026
Google Scholar
[7]
L. Lu, A one-vendor multi-buyer integrated inventory model, European Journal of Operational Research, vol. 81, pp.312-323, (1995).
DOI: 10.1016/0377-2217(93)e0253-t
Google Scholar
[8]
H. Siajadi, R. N. Ibrahim, and P. B. Lochert, A single-vendor multiple-buyer inventory model with a multiple-shipment policy, Int J Adv Manuf Technol, vol. 27, pp.1030-1037, (2006).
DOI: 10.1007/s00170-004-2267-4
Google Scholar
[9]
M. Hoque, Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain, European Journal of Operational Research, vol. 188, pp.811-825, (2008).
DOI: 10.1016/j.ejor.2007.05.019
Google Scholar
[10]
T. Kim, Y. Hong, and S. Y. Chang, Joint economic procurement-production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system, Int. J. Production Economics, vol. 103, pp.199-208, (2006).
DOI: 10.1016/j.ijpe.2005.06.005
Google Scholar
[11]
M. Y. Jaber and S. K. Goyal, Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers, Int. J. Production Economics, vol. 116, pp.95-103, (2008).
DOI: 10.1016/j.ijpe.2008.08.001
Google Scholar