Design Scheme for New Workover Mechanical System

Article Preview

Abstract:

In workover operation, conventional way makes the process complex, labor intensity high and operating environment hostile. For solving the problem, the new scheme for workover mechanical system was put forward. Hanger was removed in the system. We can execute tube movement with macro/micro mechanical arm and achieve sending down and lifting pipe with supporting mechanical hands. It is designed for the first time in china.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 538-541)

Pages:

2982-2985

Citation:

Online since:

June 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shiguang Cui:Automatic Workover Device of Oil Field In Chinese( 2003)

Google Scholar

[2] Baozeng Zhang: Oil Field Equipment In Chinese Vol.10(2006),p.49

Google Scholar

[3] Mining department of East China Petroleum Institute:China Petroleum Machinery In Chinese(1984)

Google Scholar

[4] CasseeU, Rock D, Kara D, et al: SPE Drilling &CompletionVol.21(2006),p.248

Google Scholar

[5] Simpson M, Davidson, James C: US(2004)

Google Scholar