The Application and Construction of Light Steel Roof Truss in the Hydropower Station Tunnel

Article Preview

Abstract:

The hydropower station tunnel construction is crossover operation and environment is poor. Installation space and time are limited. The paper introduces corresponding measures and installation method.Through field investigation and vast demonstration, using electric hoist and little bridge machine in equipment assembly area can avoid the effect to power house equipment installation and reduce crossover operation time. Using installation platform on the little bridge in hydro-generator area can reduce the use of the little bridge machine and improve the installation efficiency .

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 538-541)

Pages:

3160-3164

Citation:

Online since:

June 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Bo Lu: Design Drawings of Design and Research Institute of Wuhan University of Science and Technology (In Chinese) (Design and Research Institute of Wuhan University of Science and Technology, China 2010)

DOI: 10.21659/cjad.23.v2n308

Google Scholar

[2] High Strength Bolts with Large Hexagon Head for Steel Structures (In Chinese) (China Planning Press, China 1991).

Google Scholar

[3] Code for Design of Steel Structures (In Chinese) (China Planning Press, China 2003).

Google Scholar

[4] Technical code of cold-formed thin-wall steel structures (In Chinese) ((China Planning Press, China 2002).

Google Scholar