p.2436
p.2447
p.2452
p.2459
p.2466
p.2472
p.2478
p.2483
p.2489
Research on Management Scheme for Total Amount Control of Groundwater Exploitation in Heping Irrigation District
Abstract:
Through analyzing the current water resources environment and current situation of groundwater utilization, the allowable water yield in the study area is calculated to be 11.0×104m3/d by using the water balance method. Then, using the amount as constraint condition, the critical groundwater levels are decided. Furthermore, a management scheme of total amount control of groundwater exploitation is given, which includes 3 aspects: (a) Building the monitoring well system; (b) Establishing the association for water users and water utilization groups; (c) Setting up a whole rewards and punishments regulation. This study is expected to provide scientific references and methods for relevant research.
Info:
Periodical:
Pages:
2466-2471
Citation:
Online since:
July 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: