Design of Broad-Columns Joint and Analysis of Stress for Top-down Construction Method of Underground Engineering

Article Preview

Abstract:

According to the force problems caused by changing of structure forms of broad-column joints when using top-down construction method, this paper introduces the process of top-down construction method and design method of broad-column joint, using finite element software to analyze the stress of ring beam around broad-column joint, which is verified that adopting ring beam is safety and reliable, ring beam can transfer load and bear moment effectively, the strength of outsourcing column will be checked, finally it summarizes the characteristics of ring beam using top-down construction method.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1214-1218

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] JGJ165-2010 [S]: Technical specification for top-down construction method of underground buildings.

Google Scholar

[2] . Xiliang Gao, Zhiyong Luo, Yunjin Lai and Yanbin Gao: Node design and analysis calculation of beam-column for top-down construction method [J].Railway Engineering Journal, p: 74-79.

Google Scholar

[3] The fourth construction & engineering company in Guangzhou: Construction Method of top-down construction of underground buildings [J]. Fujian Building Materials Journal,2001,30(1).

Google Scholar

[4] Qi Zhao, Jianbin Xie and Zhenwei Mao: Joint treatment of top-down construction method of deep foundation for high building [J]. Underground Space and Engineering, 2006 2 (4), p:614-645.

Google Scholar

[5] Sunjie Xu, Jinliang Huang, Xiejun Rao and Caizhong Fan: Construction technology of stiffened column pile of top-down construction method for basement of soft ground in Shanghai [J]. Fujian Building Journal, 2005, (5.6), p: 311-314.

Google Scholar