Effect of EPB Shield Tunneling on Adjacent High Speed Railway Viaduct

Article Preview

Abstract:

Based on a project of subway constructed near elevated high speed railway, FEM method is adopted to analyze the effect of shield tunneling on the horizontal and vertical displacement of pile foundation of the viaduct as well as the pile caps on the condition that the nearest clear distance is 5m. The results show that with appropriate parameter control of shield tunneling, the effect of EPB shield tunneling on the displacement of piles in the three directions, i.e. horizontal displacement along and perpendicular to the longitudinal direction of the rail line and vertical displacement, is little. The same goes for the differential settlement between pile caps.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1234-1239

Citation:

Online since:

November 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Research on the effect of adjacent tunnel construction on existing pile foundation, Railway Engineering, 2011, 72-74.

Google Scholar

[2] ZHANG Zhiqiang, HE Chuan, Research on mechanics behaviour of a shield tunnel construction in metro adjacent to exsiting pile foundation, Journal of the China Railway Society, 2003, 25(1): 92-95.

Google Scholar

[3] LI Yong sheng, HUANG Hai Ying. Computation of Mechanical Effects on Adjacent Piles by Shield Excavation[J]. Journal of Tong ji University. 1997, 25(3): 274-277.

Google Scholar

[4] YANG Chao, HUANG Mao-song, LIU Ming-yun Three-Dimensional Numerical Analysis of Effect of Tunnel Construction on Adjacent Pile Foundation[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(Supplement1): 2601-2607.

Google Scholar

[5] ZHOU Guannan, ZHOU Shunhua, WANG Chunkai, SONG Tiantian. Influence of Shield Tunnel Construction on Short Pile Foundation-Frame Structure, China Railway Science, 2009, 30(4): 51-57.

Google Scholar

[6] YU Ning, ZHU He-hua. The Simulation of Shield Tunnel Construction and Analysis of Its Influence upon Surrounding Environments[J]. Rock and Soil Mechanics, 2004, 25(2): 293-296.

Google Scholar

[7] ZHANG Zhiqiang, HE Chuan, Study on The Mechanical Behaviour of A metro Tunnel Construction Adjacent to Existing Pile Foundation in Shenzhen, Chinese Journal of Geotechnical Engineering.

Google Scholar

[8] ZHU Feng-bin, YANG Ping, ONG C W. Numerical Analysis on Influence of Shield Tunnel Excavation to Neighboring Piles[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(2): 299-302.

Google Scholar

[9] Numerical Simulation Analysis on Influence of Shield Excavation Tunnel Close to The Piles of A Building, Chinese Journal of Geotechnical Engineering, 2006, 2(4): 561-565.

Google Scholar

[10] YANG Xiaojie, DENG Feihuang, NIE Wen, LI Guigang, Study on Effect of Metro Tunneling on Carrying Capacity of Pile Foundation, Chinese Journal of Rock Mechanics and Engineering, 2006, 25(6): 1290-1295.

Google Scholar

[11] LIU Feng, NIAN Yankai, YANG Qing, LUAN Maotian, Research on Influence of Tunneling on Working Performance of Adjacent Pile Foundation, Rock and Soil Mechanics, 2008, 28(supp): 615-620.

Google Scholar