Research on Stability in Metro Tunnel Constructing with Shallow Buried Covered Excavation in Loose Sand Layers

Article Preview

Abstract:

For subway tunneling in urban underground, high safty of construction is needed.However, the safty and rationality of excavating plan are forecasted difficultly because of consealment. Based on the Zhang-Shen tunnel construction of Shenyang subway, bench method, single side-wall heading excavation method and CD excavation method are numerical simulated; according to the numerical calculation results and the constructing process, bench method is adopted; the ground settlement caused by excavation monitored during excavating is in the allowed range and the tunnel is safe during excavating.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1240-1244

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] ZHANG Cheng-ping, ZHANG Ding-li, WANG Meng-shu et al. Catastrophe Mechanism and Control Technology of Ground Collapse Induced by Urban Tunneling.

Google Scholar

[2] SUN Jun, LIU Hong-zhou. 3-D Numerical Simulation of Ground Surface Settlement under Overlapped Shield Tunneling.

Google Scholar

[3] HUANG Ming-li et al. Study on Construction Technique of Large Section Sub-sea Sunnel Crossing The Weak Stratum.

Google Scholar

[4] ZHU He-hua, HUANG Feng, XU Qian-wei. Model Test and Numerical Simulation for Progressive Failure of Weak and Fractured Tunnel Surrounding Rock Under Different Overburden Depths.

Google Scholar

[5] QI Tai-yue, BAI Yong-xue, LI Bin. Optimization of Complex Cross-Section Metro Tunnel Excavation and Its Influence on Building.

Google Scholar