Risk Assessment of High-Speed Railway Tunnel Construction Based on Fuzzy Synthetic Evaluation

Article Preview

Abstract:

Because of its large scale, long cycle and complex construction, the high speed railway tunnel construction exists many uncertain risk factors which are random and fuzzy, that makes it difficult to do quantitative analysis by general research methods. A synthetic evaluation index system for tunnel construction risk of high-speed railway is established by analyzing the factors that influence high-speed railway construction, and the analytic hierarchy process is used to determine the weight of each stage factor. Based on the hierarchy of each factor, a model of three-stage fuzzy synthetic evaluation is proposed, the fuzzy sets method is used to determine membership function, and risk ranking is also classified. The proposed method is applied to a Tian jiashan Tunnel construction of Shanghai-Kunming (Hu-Kun) high-speed railway. The analysis results show that the method is reasonable and practical, and it will be taken as an example by other similar projects.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1251-1256

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] QI Shi-fang, JIA Yue-yang. The Theoretical Survey of Risk Management on Engineering Projects [J]. Journal of Taiyuan University of Technology, 2002(01) (In Chinese)

Google Scholar

[2] DING Xiang-qian, SHI Shuo. Application of the Analytic Hierarchy Process to Project Risk Management [J]. Periodical of Ocean University of China, 2004(01) (In Chinese)

Google Scholar

[3] Saaty T. L.. Fundamentals of the Analytic Hierarchy Process [M]. Pittsburgh: RWS Publications, (2000)

Google Scholar

[4] YU Jian-xing, The management and control of risk assessment for engineer [M], Tianjing: China Construction Industry, 2009(In Chinese)

Google Scholar

[5] ZHAO Yan-xi, XU Wei-ya. Risk assessment of TBM construction for tunnels based on AHP and fuzzy synthetic evaluation [J]. Rock and Soil Mechanics, 2009, 30(3): 793–798(In Chinese)

Google Scholar

[6] GUO Zhong-wei, Risk analysis and decision [M], Beijing: Mechanical Industry Press, 1986(In Chinese)

Google Scholar

[7] Ministry of Railways of the People's Republic of China. Guideline of risk management for tunnel of railways [M]. Beijing: China Architecture & Building Press, 2007(In Chinese)

Google Scholar