AHP-Based Research on the Selection of Construction Project Subcontractor

Article Preview

Abstract:

AHP is usually adopted by design-build enterprise to help to make decision in subcontractor selection and build hierarchical structure for the target and evaluation factors which both may affect the selection decision, and meanwhile propose a proper analytical mode and calculation method. This paper takes an concrete engineering example as research object, and the research result shows that AHP can give the priority to impact factors among various factors and obtain the order of comprehensive weight of each impact factors, and eventually help to select a satisfactory subcontractor. This method reduces the influence from personal factor and enhances the objectivity and scientific of each decision.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

3035-3039

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhongfu Li.Xingkai Jing, Joural of Engineering Management Vol.24(2010), P550

Google Scholar

[2] AI-Harbi,Kamal M. Application of the AHP in Project Management. International Journal of Project Management.2001,19(1),P19~27

Google Scholar

[3] Weishan Yang, Coastal Enterprises and Science & Technology Vol.10 (2006), p.71

Google Scholar

[4] Qiyuan Jiang.Jinxing Xie.Jun Ye Mathematical Model [m] Beijing. Higher education press.(2004)

Google Scholar