Discussion and Realization on Quality Management Methods of Steam Turbine Unit Installation in Tianjin SDIC Jinneng Power Plant

Article Preview

Abstract:

During the steam turbine unit installation, combined with the project quality management theory, summarized the quality management methods of making the quality plan and the guarantee, quality control and improvement. Achieve the good results through the application in the SDIC Power Plant team turbine unit installation. And has good promotion and reference for the same or related industry.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 614-615)

Pages:

1924-1927

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Wenwei Liao and Erxian Zeng: Electric Power Construction. Vol. 31 (2010), pp.6-9. In Chinese.

Google Scholar

[2] Shumin Zhou: Electric Power Construction. Vol. 26 (2005), pp.46-47. In Chinese.

Google Scholar

[3] Desen Dai: Electric Power Construction. Vol. 30 (2009), pp.83-88. In Chinese.

Google Scholar

[4] Qingnian Zhang: Electric Power Construction. Vol. 30 (2009), pp.79-81. In Chinese.

Google Scholar

[5] Jianping Jiang: Electric Power Construction. Vol. 29 (2008), pp.87-91. In Chinese.

Google Scholar

[6] Weiyang Xie: East China Electric Power. Vol. 33(2005), pp.39-42. In Chinese.

Google Scholar

[7] Shengjie Zhang and Gang Liu: Electric Power Construction. Vol. 33 (2012), pp.69-72. In Chinese.

Google Scholar

[8] Yaqin Zhou and Yong Guo: Electric Power Construction. Vol. 35 (2011), pp.63-64. In Chinese.

Google Scholar

[9] Hanzhan Chen: Sichuan Electric Power Technology. 1981,(02), pp.9-12. In Chinese.

Google Scholar

[10] Yi Zhai and Yinyan Lu: Electric Power Construction. Vol. 30 (2009), pp.91-96. In Chinese.

Google Scholar