p.360
p.365
p.370
p.376
p.380
p.384
p.390
p.396
p.402
Network Parallel Electrical Method for Dam Foundation in Coal Mining Subsidence Area Hazard Evaluation
Abstract:
Thelarge-scale exploitation of coal resources, will cause large area ground subsidence, soil quality to destroy and civil building foundation engineering problems, give the people live and work in peace brings a harm. This article from the network parallel electrical fundamentals and application premise to proceed, with Xie pool mining subsidence area new Xie dam engineering geological background, site layout of the two line, a 128 electrode, analysis of the detection results, on the ground by means of artificial method, electric field distribution, can quickly determine the quality of dam foundation damage points, provide geological basis for its management.
Info:
Periodical:
Pages:
380-383
Citation:
Online since:
December 2012
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: