[1]
Samman R. and Graham I., The Six Sigma Project Management Strategy, Procs 23rd Annual ARCOM Conference, 587-596, Belfast, UK, (2007).
Google Scholar
[2]
Karakhan A.: Quality Evaluation of Construction Factories by Using Six Sigma Approach, MSc Thesis, Civil Department, College of Engineering, University of Baghdad, Baghdad, Iraq, (2011).
Google Scholar
[3]
Chen K. S., Hsu C. H. and Ouyang L. Y., Applied Product Capability Analysis Chart in Measure Step of Six Sigma, Quality and Quantity Journal, Vol. 41, No. 3, pp.387-400, Springer, (2006).
DOI: 10.1007/s11135-006-9009-7
Google Scholar
[4]
Sullivan K. T., Applied Quality Management Programs in the Construction Industry: Best Value Compared with Other Methodologies, Journal of Management and Engineering, Vol. 27, No. 4, pp.210-219, ASCE, (2011).
DOI: 10.1061/(asce)me.1943-5479.0000054
Google Scholar
[5]
Pheng L. S. and Hui, M. S., Implementing and Applying Six Sigma in Construction, Journal of Construction Engineering and Management, Vol. 30, No. 4, pp.482-489, ASCE, (2004).
DOI: 10.1061/(asce)0733-9364(2004)130:4(482)
Google Scholar
[6]
Tehrani M. D., Performance Improvement in Construction Project based on Six Sigma Principles, MSc Thesis Submitted to the Department of Quality and Environmental Management, Industrial Engineering, University of Borås, Sweden, (2010).
Google Scholar
[7]
Schroeder R., Operation Management: Contemporary Concepts and Cases, Third Edition, McGraw-Hill company, Inc., (2008).
Google Scholar
[8]
Nyrén G., Product Development According to Six Sigma and the DMAIC Improvement Cycle, MSc Thesis, Department of Business Administration and Social Sciences, Industrial Business Administration, Leleå University of Technology, (2010).
Google Scholar
[9]
Arthur J., Six Sigma Simplified, Third Edition, LifeStar Publishing, USA. (2004).
Google Scholar