[1]
Chengzhong Yang, Benqing Hu. Ground Penetrating Radar use on Tunnel disaster warning[J]. Applied Mechanics and Materials Vols. 80-81(2011)pp.1320-1323.
DOI: 10.4028/www.scientific.net/amm.80-81.1320
Google Scholar
[2]
LIU Chaoqun.The advanced geological detection and prediction in conslruction of tunnel[J].China Science and Technology Information,2007,(22):38—39(in Chinese).
Google Scholar
[3]
WANG Bao,LI Guilin,ZHANG Liguo.The application of advanced geological predictiontechnology in tunnelengineering[J].Railway Standard Design,2007, Supp 11:220—223.(in Chinese).
Google Scholar
[4]
GUO Baofei,TAN Hua,LI Liangtian,eta1.Study on advanced detection and prediction of adverse geological condition in highway tunnel[J].Chongqing Architecture,2007,(11)23—25.(in Chinese).
Google Scholar
[5]
QU Haifeng,LIU Zhigang,ZHU Hehua.Technique of synthetic geological prediction ahead in tunnel information construction[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1 246—1 251.(in Chinese).
Google Scholar
[6]
WANG Chengbing,D1NG Wenqi,YOU Guangming.The advanced geological prediction technique of tunnel and its application[J].Hydrogeology and Engineering Geology,2007,34(1):120—122.(in Chinese).
Google Scholar
[7]
DENGYoudong.Application of geologic forecast in Wu Qiaoling long tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(Supp.2 :5 140—5 146.(in Chinese) ).
Google Scholar
[8]
LIU Xiufeng,MA Changqing.Application research on the integrated geological forecast in advancein construction of Xiaopingzi tunnel[J].Journal of Railway Engineering Society,2007,(1 11:5—8.(in Chinese).
Google Scholar
[9]
LI Shucai,XUE Yiguo,ZHANG Qingsong,eta1.Key technology study of comprehensive prediction and early—warning of geological hazards during tunnel construction in high-risk karst areas[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 297—1 307.(in Chinese).
Google Scholar
[10]
WANG Qinghai,LI Xiaohong,XIA Binwei,eta1.Application of advanced prediction and forecast in Bijiashan tunnel construction[J].Rock and Soil Mechanics,2005,26(61:951—954.(in Chinese).
Google Scholar
[11]
BAI Zhe.Application of GPR in geology forecast for tunnel[M.S.Thesis][D].Wuhan:Wuhan University of Technology,2006.(in Chinese).
Google Scholar
[12]
GEOHYDRAULIK D.Beam real-time ground prediction[R].Kirchvers:Geohydraulik Data, Corp,2004.
Google Scholar
[13]
ZANG C W,HUANG H W,ZHANG Z X.Forecasting the starta condition of a long road tunnel by using fuzzy synthetic judgment[J].International Journal of Rock Mechanics Science,2004,41(3):1—6.
Google Scholar
[14]
LICangsong,HE Faliang,DING Jianfang.Synthesis prediction technology of karst geology in Wulong tunnel[J].Hydrogeology and Engineering Geology,2005,(2):96—100.(in Chinese).
Google Scholar
[15]
LI Tianbin.Smdy of fore geological prediction in highway tunnel of complex geological conditions[R].Chengdu:Chengdu University of Technology,2005.(in Chinese).
Google Scholar