Guiding Survey Technology for Long Curved Pipe Jacking

Article Preview

Abstract:

The paper discusses guide survey system in long distance curved pipe jacking, presents a three-dimensional datum transformation model to determine the orientation of jacking pipe,The unitary principle and the new navigating method are introduced and the methods accuracy and variance are analyzed. The intelligence guide system is carried through easily associate with total station. The mathematical model, the operation principle, the hardware realization of extra long pipe jacking automatic guidance are introduced. Practice shows that all the reference points are used more efficiently in the new model than in the general model, and the surveying and navigating system gets enormous time-saving against conventional methods

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 639-640)

Pages:

247-250

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] FENG Dongjian, PAN Qinglin and ZHANG Fengmei. On the orientation survey of the shield in subway construction. Geo-Technical Investigation & Surveying. 5( 2003) 57-58.

Google Scholar

[2] CHEN Yi, SHEN Yunzhong and LIU Dajie. A simplified model of three dimensional-datum transformation adapted to big rotation angle. Geomatics and Information Science of Wu-han University.12(29) ( 2004)1101-1105.

Google Scholar

[3] Pan Guorong, ZhouYing, Zhang Dehai.3D Datum Transformation Model for Determining Orientation of Shield in Subway Construction. Journal of Geodesy and Geodynamics.26(3) (2006)84-87.

Google Scholar