Applied Research on Dynamic Replacement Method in Tailings Residue Subgrade Reinforcement

Article Preview

Abstract:

Based on the reinforcing mechanism of dynamic replacement method ,this article put forward the construction parameters and measures of dynamic replacement method , combining with the result of actual engineering field testing experiment. The field load test, standard penetration test and pore water pressure test results show that the characteristic value of subgrade bearing capacity is more than 130 kpa when the tailings residue subgrade has been managed with dynamic replacement method, providing references for applied research on dynamic replacement method in tailings residue subgrade reinforcement.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 639-640)

Pages:

943-946

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Building foundations to deal with technical specifications(JGJ79- 2002),S.

Google Scholar

[2] LU Xiu-jie,GONG Xiao-nan,LI Jian-guo,Research on barameters of construction with dynamic combaction method,J. Rock and Soil Mechanics.9(2000) 1628-1632.

Google Scholar

[3] ZHENG Xiao,LIU Sheng gun,ZHUO Fan,Ascertaining the Design Parameters of Intense Densification and the Study of Scene Experiment,J.Journal of Jiangxi University of Science and Technology. 12(2007) 46-49.

Google Scholar