Blasting Excavation and Vibration Monitoring Design for Diversion Tunnel

Article Preview

Abstract:

Because of the local crack and seepage, a double curvature arch dam of concrete block in Jiangxi Province was urgently needed to strengthen, and the construction period was limited seriously. In order to solve the problem of drainage, a diversion tunnel about 24m must get throng in two weeks, and it is proved that the blasting excavation scheme is the only choice. Meanwhile, monitoring measurement must be taken to ensure the dam’s safety. In this article, the optimization design of blasting excavation and a vibration monitoring are completed and carried out respectively. Theoretical calculations and monitoring results showed that, those design schemes are scientific and rational, and disadvantageous effect of blasting vibration is under the control fully.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 639-640)

Pages:

969-973

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yang Qigui, Gao Dashui, Prospect and status of reinforcement technology of dangerous reservoir in China, Yangtze River[J], Blasting, 2011, 42(12):6-11.

Google Scholar

[2] Liu Fengcheng, Hu Wuxing ,Cui xuecheng, Analysis on test result of blasting vibration of anchored crane beam in Xilongchi power station[J] , Journal of Yangtze River Scientific Research Institute, 2008, 25(5): 171-174.

Google Scholar

[3] Zong Qi,Wang Haibo, Zhou Shengbing, Research on monitoring and controlling techniques considering effects of seismic shock[J], Chinese Journal of Rock Mechanics and Engineering , 2008, 27(5): 938-945.

Google Scholar

[4] Deng Huafeng, Zhang Guodong etc., Monitoring and analysis of blasting vibration in diversion tunnel excavation[J], Rock and Soil Mechanics, 2011, 32(3): 855-860.

Google Scholar

[5] Wang Xuguang, Yu Yalun, On several problems of safety criterion for blasting Vibration[J], Engineering Blasting, 2011, 7(2): 88-92.

Google Scholar

[6] Li Binfeng, Analysis of controlling measurement and blasting vibration effect[J], Blasting, 2003, 20(2): 83-85.

Google Scholar

[7] Zhang Yunpeng, Li Cunguo, The development of safety criterion on blasting vibration effect[J], Jouneral of Hebei Institute of Technology, 2003, 25(3): 119-122, 126.

Google Scholar

[8] Hua Gang, Analysis of the safety criteria for blasting vibration[J], Blasting, 2004, 21(2): 98- 100.

Google Scholar

[9] Fu Shigen, Wang Yunhai, Xu Kaili, Study on the evaluation of blasting vibration effect and measures of reducing vibration[J], Journal of Safety Science and Technology, 2008, 4(6): 25-28.

Google Scholar

[10] 'Security Regulations for Blasting'(GB6722-2003), 2004.

Google Scholar

[11] Wang Xuguang, Yu Yalun, Liu Dianzhong, Enforceable handbooks of safety regulations for blasting[M], China Communications Press, 2004.

Google Scholar

[12] Xu Hongtao, LuWenbo, Advance on safety criterion for blasting vibration[J], Blasting, 2002, 19(1): 8-10.

Google Scholar