p.1114
p.1122
p.1126
p.1131
p.1135
p.1140
p.1144
p.1150
p.1156
The Study on the Control of the Early-Stage Crack of the Concrete Poured in Winter in Shenyang Subway
Abstract:
The control of concrete crack is a complicated and difficult problem for civil engineering. It is more difficult to control the crack of the concrete poured in winter. Thorough the analysis of the construction of Shenyang subway in winter, a combination of methods are applied. Frost proof and decreasing the temperature stress of concrete are considered together. The combination of antifreezing measures and decreasing the temperature stress of concrete make the construction quality arrive a satisfying level.
Info:
Periodical:
Pages:
1135-1139
Citation:
Online since:
March 2013
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: