Analysis on Reinforcement and Design of a Historic Building Retrofitting Project

Article Preview

Abstract:

Retrofitting and reinforcement project of a historic hotel building are introduced in article. The method of increasing new concrete frame structure in original structure interior and the original exterior wall considered as a retaining structure was adopted in the retrofitting and reinforcement project. The structure subjecting to the force was clear and the reinforcement construction process was relatively simple after the retrofitting and reinforcement. Design and construction of the structure strengthened are according to the existing code completely and can ensure the safety and the seismic performance of the structure.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 671-674)

Pages:

622-625

Citation:

Online since:

March 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Historical Constructions, P.B. Lourenço, P. Roca (Eds. ), Guimarães, 2001, pp.1013-1020.

Google Scholar

[2] P. Georgakopoulos, P. Koklanos. Design, Detailing, and Architectural Impacts of Fiber Reinforced Polymers (FRP) and Geotextile Fabrics in the Blast Mitigation of Unreinforced MasonryWalls in Historic Buildings. Structures Congress 2012. pp.358-369.

DOI: 10.1061/9780784412367.032

Google Scholar

[3] China , 2011. Code for design of masonry structures(GB50003-2011).

Google Scholar

[4] China , 2011. Code for design of strengthening masonry structures(GB50702-2011).

Google Scholar

[5] T. Matsuo, K. Tanaka, Mechanism of Efflorescence on Historical Brick Buildings Reinforced with Concrete Wall, Summaries of Technical Papers of Annual Meeting Architectural Institute of Japan, 2003, pp.925-926.

Google Scholar

[6] LIU Fujun ZHU Yuhua MA Xiaohui. Finite Element Analysis for Seismic Performances of Unreinforced Masonry Walls Strengthened with Inside Structural Column. Structural Engineers, 2011, 27(3): 62-66(in chinese).

Google Scholar