[1]
Li Haicai, Reliability usability and maintainability [M], Qing Hua University Publishing House, Beijing.
Google Scholar
[2]
Yuan Zhuzhi, The Application of Modern Control Theory in Enginering [M], Science and Technology Publishing House, Beijing.
Google Scholar
[3]
Xie Kaiyan, The reliability design research of control sys-tem in large and middle size wind turbines [J], Mechanic-cal and Electrical Engineering, 1998, (1): 1-2.
Google Scholar
[4]
Arabian H H,Oraee H,Tavner P J.Wind turbine productivity considering electrical subassembly reliability[J].Renewable Energy,2010(35):190-197.
DOI: 10.1016/j.renene.2009.04.014
Google Scholar
[5]
Tavner P J,Xiang J,Spinato F.Reliability analysis for wind turbines[J].Wind Energy, 2007(10): 1-18.
DOI: 10.1002/we.204
Google Scholar
[6]
Ko H S,Yoon G G,Kyung N H,et al.Modeling and control of DFIG-based variable-speed wind-turbine[J].Electric Power Systems Research,2008(78):1841-1849.
DOI: 10.1016/j.epsr.2008.02.018
Google Scholar
[7]
7Chan G K,Asgarpoor S.Optimum maintenance policy with Markov processes[J].Electric Power Systems Research,2006(76):452-456.
DOI: 10.1016/j.epsr.2005.09.010
Google Scholar
[8]
Achermann T, Garner K, Gardiner A. Embedded Wind Generation in Weak Grids-economic Optimization and Power Quality Simulation [J]. Renewable Energy, 1999 , 18(2): 205-221.
DOI: 10.1016/s0960-1481(98)00794-0
Google Scholar
[9]
Amora M A B, Bezerra U H. Assessment of the effects of wind farms connected in a power system [J]. Power Tech Proceedings,IEEE. 2001, Porto. Vol. 4:6.
DOI: 10.1109/ptc.2001.964846
Google Scholar
[10]
Wiik J,Gjerde J O, Gjengedal T, etal. Steady state power system issues when planning large wind farms [J]. I EEE Power Engineering Society Winter Meeting. 2002, 1: 366-371.
DOI: 10.1109/pesw.2002.985021
Google Scholar