In view of the highly randomness and uncertainty in the working condition of crane, take bridge crane as the research object. Firstly, based on the technology of the internet of things, the load capacity and the number of work cycles would be recorded, and the fatigue stress spectrum would be formed. Secondly, based on the Miners fatigue damage accumulation theory and the rain-flow algorithm, the equivalent stress amplitude would be obtained. Thirdly, curve regression model has been used to characterizing the relationship between the crack propagation and equivalent stress amplitude, and predicting the current crack size. Lastly, taking the predicted value of the crack size into the fracture mechanics formula, and estimated the remaining fatigue life of the bridge crane. The example demonstrated that, it is simple and practical to apply the techniques of the internet of things and the regression forecasting to the data collection and crack size prediction; it not only be able to estimate the remaining fatigue life quickly and accurately, but also be able to overcome the drawback of requiring the initial crack size in the fracture mechanics.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 690-693)

Pages:

3381-3385

Citation:

Online since:

May 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Special Equipment Bureau of AQSIQ. 2007 National Special Equipment Safety Status [Z], 2008. 4

Google Scholar

[2] Zhao Yongxiang. On the Strain-based Fatigue Reliability Analysis [J]. Journal of Mechanical Engineering, 2001, 37(11): 1-6.

Google Scholar

[3] Zeljko D, Lover K.O., MLADEN S. Fatigue Cracks and Failures in Cement Industry, Shipbuilding and Power Plant Facilities [J]. Engineering Failure Analysis, 2005, 12: 819-833.

DOI: 10.1016/j.engfailanal.2005.01.003

Google Scholar

[4] Suresh S. Wang Z.G.. Material Fatigue [M]. Beijing: National Defence Industry Press, 1993: 144-188.

Google Scholar

[5] Zhai J.C., Wang S.. Fatigue test of welded box girder of overhead travelling crane [J] . Hoisting and Conveying Machinery, 1994, (2): 3-8.

Google Scholar

[6] Cheng Wen-ming, Wang Jinnuo. The estimation of fatigue crack extension life for overhead and gantry cranes [J]. Hoisting and Conveying Machinery, 2001(2): 1-4.

Google Scholar

[7] Ghidini T, Dalle D.C. Fatigue Life Predictions Using Fracture Mechanics Methods [J]. Engineering Fracture Mechanics, 2009, 76(2): 134-148.

DOI: 10.1016/j.engfracmech.2008.07.008

Google Scholar

[8] Guo J.S., Sun G.Z. Fracture mechanics method for estimating the fatiguelife of welded steel structure [J]. Hoisting and Conveying Machinery, 1999, (10): 9-12.

Google Scholar

[9] Fan Xiaoning, Xu Gening, Wang Aihong. Evaluation Method of Remaining Life for Crane Based on the Acquisition of the Equivalent Load Spectrum by the Artificial Neural Network [J]. Journal of Mechanical Engineering, 2011, 47(20): 69-74.

DOI: 10.3901/jme.2011.20.069

Google Scholar

[10] Wang Aihong, Xu Gening, Gao Youshan. Random Stress Spectrum Acquisition and Fatigue Residual Life Estimate for Overhead Travelling Crane [J]. Journal of Mechanical Engineering, 2012, 48(18): 192-198.

DOI: 10.3901/jme.2012.18.192

Google Scholar

[11] GUO Jiansheng, SUN Guozheng. Estimate fatigue life using fracture mechanics for welding steel structures [J]. Hoisting and Conveying Machinery, 1999(10): 9-12.

Google Scholar

[12] Wu Xiao, Luo Wei, Liu Lu, Huang Yuanyuan.. Prediction of Metal Structure Fatigue Life of Bridge and Gantry Crane in Service [J].China Safety Science Journal, 2010, 20(2): 95-99.

Google Scholar