Failure Analysis and Welding Repair for Water Wall Tube Burst of 600MW Station Boiler

Article Preview

Abstract:

Through methods, such as microscope analysis, mechanical analysis, chemical analysis, metallography examination etc, the causes resulting in water wall tube bursting of 600MW station boiler have been analyzed. The result indicates this water wall tube burst is the high temperature creep fracture. The higher operating temperature, microstructure aging and high temperature strength degradation are the primarily inducement of bursting failure. In welding tube, the measures of reducing residual stress, such as lower welding heat input, reducing thickness of welding layer, assigning reasonably heat treatment power, lengthening holding time and so on, were taken. The welding repair succeeded greatly.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 706-708)

Pages:

1339-1343

Citation:

Online since:

June 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Information on http://www.weld.labs.gov.cn

Google Scholar