Design and Simulation Analysis for Power Plant Coal Storage Bunker Girder Structure

Article Preview

Abstract:

The structure of the closed square storage bunker main, secondary beam are designed in detail, and has carried on the simulation using finite element analysis software ANSYS, results show that the main structure of the design to meet the design requirements.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 706-708)

Pages:

488-491

Citation:

Online since:

June 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wang Yuedong. Dry coal shed structure selection. The 7th National Conference on Structural Engineering,2007:561-564

Google Scholar

[2] Zhang Ailin, Ren Weijir. Optimum Design Based on Safety Constraints of Multi-stage Pre-stressed Steel Structures. China Civil Engineering Journal, 2005, 38:26-30

Google Scholar

[3] X.F. Yuan, S.L. Dong. Tintegral Feasible Prestress of Cable Dome. Computer and Structure,2003, 81:2111-2119

Google Scholar