Execution Process Monitoring for Ship Curved Block Construction Based on Task Package and Workload Distribution Sheet

Article Preview

Abstract:

Aiming at the demands of top-down task transmission and bottom-up status coordination in the execution of ship curved block construction, a hierarchical execution process monitoring technique considering workplace, curved block, task package (TP) and workload distribution sheet (WDS) was put forward. Adopting linear fitting and graphics epitaxy, the plane vector projection modeling for ship curved block was achieved. Based on visualized monitoring technology for curved blocks evolution over time in workplace, a hierarchical execution process monitoring system was built. Through data collection and feedback based on work distribution sheet, the backwards status coordination was implemented. At last, the validity of the proposed technique was verified by an application example.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

602-607

Citation:

Online since:

June 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] ZHANG Hu-jun, MA Xiao-ping. The Study of Manufacturing Resource Database Based on Lean Shipbuilding. Shipbuilding Technology, 2012, 305(1):52-56

Google Scholar

[2] SU Xiang,YANG Yan-yan, LI Da-wei. Research on shipbuilding planning based on critical chain. Modern Manufacturing Engineering, 2009, (2):29-31

Google Scholar

[3] Zhang Tao. Research on Production Plan Management Informationization of Ship Manufacture Enterprise. Dalian Maritime University, (2010)

Google Scholar

[4] Zhao Dong, Liu Cungen. MAS-based shipbuilding scheduling system. Journal of Jiangsu University of Science and Technology, 2010, 24(1):23-26

Google Scholar

[5] ZHANG guangfa, Liu Yujun, JI Zhuoshshang etal. Simulation of Ship Block Construction Planning. SHIPBUILDING of China, 2010, 51(4):185-193

Google Scholar