The Risk Management Method for Project Schedule of Aerospace Engineering

Article Preview

Abstract:

Aerospace engineering projects usually require a huge investment and a long construction period. For this reason, a risk management method is proposed for the project schedule of aerospace engineering. In total, it is necessary to make a risk assessment and analysis on construction schedule before project implementation.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 712-715)

Pages:

3165-3168

Citation:

Online since:

June 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Bradley RM, MG Powell and MR Soulsby. Quantifying Variations in Project-Cost Estimates [J]. Journal of Management in Engineering, 1990, 6: 99-106

DOI: 10.1061/(asce)9742-597x(1990)6:1(99)

Google Scholar

[2] Williams T. A Classified Bibliography of Recent Research Relating to Project Risk Management [J]. European Journal of Operational Research, 1995, 85: 18-38

DOI: 10.1016/0377-2217(93)e0363-3

Google Scholar

[3] Williams T. Risk-management Infrastructure [J]. International Journal of Project Management, 1993, 11: 5-10

Google Scholar

[4] Hulett D. Project Schedule Risk Assessment [J]. Project Management Journal, 1995, 26: 21-31

Google Scholar

[5] Williams T. Using a Risk Register to Integrate Risk Management in Project Definition [J]. Interntional Journal of Project Management, 1994, 12: 17-22

DOI: 10.1016/0263-7863(94)90005-1

Google Scholar