Monitor for the Construction for Extra Large Solder Ball Grid Roof

Article Preview

Abstract:

There are six key points, such as steel truss column, hoisting frame, hoisting point, wire rope, wire rope connecting in the hoisting system which we construct the COMAC ministry of installed plant. This timely monitoring of several key points in the promotion process is to enhance the process controlled several indicators. For different key points used different monitoring methods for monitoring. The results showed that 6 monitoring method is reasonable, feasible. This method can provide some experiences to the construction and fabrication of the steel member of the project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

537-541

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] LIU Shutun,GUAN Yilu. The Capital Airport 306mx90m hangar roof design and construction[J]. Journal of Building Structures,1997(6)

Google Scholar

[2] GUO Yanlin,MIAO Youwu,LOU Junjie.Integral lift design of the main trusses in Macao gymnasium and analysis of the latticed hoist tower[J]. Journal of Building Structures,2005.26(1):17-24

Google Scholar

[3] CHEN Dongdong,YAO Gang.Integral lifting technology of boeing hangar roof at pudong airport[J]. journal of Chongqing jiaotong university(natural science),(2010)

Google Scholar

[4] BAO Guangjian,CHEN Boquan. Hydraulic integral lifting technology controlled by computer on spatial steel structure[J]. construction technology,2005(10)

Google Scholar

[5] LIU Biao,LIU Hang. Analysis on integral lifting process of airbus 380 hangar roof at capital international airport[J]. Journal of Building Structures,2008(4)

Google Scholar